220 kv steel tower parts performance table

Release time:2019-04-06 13:09   Article From:未知   visits:

The serial number

Project units

The name of the project

Tower type

Voltage level (kV

Quantity supplied (t)

The contract signing date

Delivery date

Put the date

The owner unit references

references

Whether the user operation

1

Shandong binzhou east force electric co., LTD

220KV Wood guo line modification

Steel tube tower

220kV

135.2

2005-01-06

2005-02-18

 2005-03-05

Ma Jilin

0543-3302512

yes

2

Shandong luneng material group co., LTD. Zaozhuang power supplies branch

220KV Ten wen Ⅰ line

Steel tube tower

220kV

168.55

2005-03-15

 2005-05-10

2005-05-28

Jiang Guanghai

0632-3315158

yes

3

Chengdu power transmission engineering company

220KV Wait too line modification

Steel tube tower

220kV

132.5

2005-04-10

2005-05-16

 2005-06-10

Zhao Shurong

028-84379758

yes

4

Macro industry of sichuan power engineering co., LTD

220KV Huayang line

Steel tube tower

220kV

122.58

2005-05-12

2005-06-21

2005-07-18

Liu Yajun

028-66288577

yes

5

Shandong luneng electric power supplies distribution co., LTD

laiwu 220KV  local line

Steel tube tower

220kV

214.4

2005-10-08

2005-11-16

 2005-12-08

Wang Chengxiu

0531-83160612

yes

6

Shandong luneng material group co., LTD., binzhou branch power supplies

220KV Dhi pay line

Steel tube tower

220kV

52.55

2005-10-11

2005-11-05

 2005-11-25

Zhang Qinglin

0543-3302512

yes

7

Shandong luneng material group co., LTD., dongying branch power supplies

220KV Diao line

Steel tube tower

220kV

135.6

2006-03-18

2006-04-21

2006-05-06

Wang Wenguo

0546-8192515

yes

8

Shandong luneng material group co., LTD. Weifang branch power supplies

220KV The green line"

Steel tube tower

220kV

288.2

 2006-05-16

2006-07-18

 2006-08-15

Liu Suming

0536-8362958

yes